Request a Proposal
Tell us about the project.
The more detail you can share about the jurisdiction, phase and required deliverables, the more precise the proposal will be.
Project-start checklist
What to gather before design begins.
Not every item applies to every project. Bring what you have — missing information is tracked as an assumption or clarification item.
- 01Architectural background drawings (DWG preferred, PDF accepted)
- 02Electrical, mechanical and fire-protection drawings, if available
- 03Project specifications, including Division 26/28 sections
- 04Addenda, bulletins and any issued RFI responses
- 05Jurisdiction and adopted code edition, if known
- 06Preferred or specified equipment manufacturer
- 07Existing fire alarm panel and device information for renovations
- 08Elevator, HVAC, smoke-control and access-control interface requirements
- 09Sprinkler monitoring points and riser information, if applicable
- 10Required deliverables, sheet format and title-block requirements
- 11Whether a PE review or seal is required in the jurisdiction
- 12Bid or permit submission date and internal review milestones
Project files can be coordinated after initial contact. Please do not send confidential drawings until a transfer method has been agreed.

